All pages and Docs
   
 
HIGH-RISE Fire Fighting
  Developing better responses to fires in tower bocks and high-rise buildings.
     
 

 

All Pages

 

FSG

Gallery

Master Links

PPV

Wind

One Line tactics

Two Line Tactics

Threeline

Zeroline

Loadbags

About

SOP

Training Firefighters

Training IC

Training First Attending

Branches

Cable entanglement

Compartmentation

Contact

Contain

Harrow

Lakanal

Lakanal2

Shirley

Telstar

Design

Detection

Disclaimer

Documents

Dry Riser

Evacuation

Flow

Glossery

Guide

Techniques

Air

wind

Breaking in tools

Lift Use

Cladding

External Fire Spread

Thermal Image Cameras

Communications

Sprinklers

Tactics

I-RISE

EXternal

Residents advice

Incident command

floor below

Fourline

Bridgehead

This link will take you away from www.highrisefire.co.uk Please be aware that we do not nesessairly endorse or support the views, opinions and expressions of this site !
This link will take you away from www.highrisefire.co.uk Please be aware that we do not nesessairly endorse or support the views, opinions or expressions of this site.

Home 
Construction
Tactics
Equipment
Technical
Training
General
Notable Incident
Disclaimer 
Contact us 
Incident Command 
On-scene INTELIGENCE 
TACTICAL SELECTION 
OPERATIONAL TACTICS
Bridgehead 
Staging Area 
Search Sector 
Lobby Sector 
Offices 
Hotels 
History 
Design 
Legislation 
Guidance 
Construction elements
Materials 
Compartmentation 
Cladding and Facades 
Windows and Balconies 
Lifts 
Stairwell 
Fire detection and Alarms 
Sprinklers 
Dry risers 
Wet risers 
Fire Shafts 
WIND DRIVEN FIRES 
FIRE SURVIVAL GUIDANCE 
AUTOEXPOSURE : External Spread 
CABLE : Entanglement & Hazards 
INTELIGENCE : Pre-Incident  
COMMUNICATION : at Incidents  
RISK  
LIFTS : Use during incident 
FLOW RATES 
PHYSICS : Fire & Smoke 
AIR MOVEMENT 
SMOKE 
FIRE ENERGY 
LIBRARY
Glossary 
Advice for residents 
SOP's 
Gallery 
Videos 
Links 
Selecting Firefighting TACTICS 
Firefighting TECHNIQUES 
No Hose line deployment 
Single Hose line 
Two Hose lines 
Three or more Hose lines 
External 
Legislation 
Guidance 
Document Library 
Folder file (beta) 
Training requirements 
Firefighter 
First attending IC 
Incident Commander 
Shirley Towers, Southampton 2010 
Lakanal House, London 2009 
Arlington House, Kent 2001 
Stanner Court, Kent 2001 
Telstar House, London 2003 
Harrow Court, Stevenage 2005 
Windsor Tower, Madrid 2005 
Manderin Oriental, Beijing 2009 
Pumps & pump operations 
Hose 
Thermal Image Cameras 
Branches (Nozzles) 
Breaking in tools 
PPV 
Load bags and load lists 
Height Vehicle 
RESCUE & SAVABLE LIFE 
INTERVENTION : TACTICS 
INTERVENTION : Firefighting Techniques 
INTERVENTION : No Hose line deployment 
INTERVENTION : Single Hose line 
INTERVENTION : Two Hose lines 
INTERVENTION : Three line 
INTERVENTION : Four line (wind driven) 
INTERVENTION : External 
STABILISATION (Control & Containment) 
EVACUATION 
Understanding the Risk 
Site Intelligence SSRI/PRM 
Hose 
Branches (Nozzles) 
Training requirements 
Firefighter 
First attending IC 
Incident Commander